In Flintshire (UK), we successfully implemented a biogas plant with eight concrete tanks in 2025: three digester tanks (ø 30.0 m, H 8.0 m), one post digester tank (ø 30.0 m, H 8.0 m), two storage tanks (ø 33.0 m, H 10.0 m) and two pre-storage tanks (each ø 10.0 m, H 8.0 m).
BioConstruct GmbH
2025
3 Digester tanks ø 30,0 x H 8,0 m
1 Post Digester tank ø 30,0 x H 8,0 m
2 Storage tanks ø 33,0 x H 10,0 m
2 Pre-Storage tanks ø 10,0 x H 8,0 m